News

Our Journey
2026
March

Pilot started

Partnered with Switch2 Offshore to build a pilot for our electrolyzer stack at the Port of Rotterdam.

2025
December

Built 7 prototypes

Over the course of the year we built several different prototypes to test and improve our design.

October

Filed two more patents

Filed two more patents to protect our bipolar plateless design and in-situ catalyst redeposition.